iCDMA · Highway (time-based)

Day 1 · Tue 2009-06-09

Sunny
Planned: $2,249,358 by day 101
Spent: $0 · site space 0/800
Schedule
115294357718599today1_Strip Topsoil(a)0%1_Strip Topsoil(b)2_Remove Concrete Pavemen…2_Remove Concrete Pavemen…2_Remove Concrete Pavemen…2_Remove Concrete Pavemen…2_Remove Concrete Pavemen…2_Remove Concrete Pavemen…3_Grade Subbase(a)3_Grade Subbase(b)3_Grade Subbase(c)3_Grade Subbase(d)3_Grade Subbase(e)3_Grade Subbase(f)3_Grade Subbase(g)3_Grade Subbase(h)4_Install Drainage(a)4_Install Drainage(b)4_Install Drainage(c)4_Install Drainage(d)4_Install Drainage(e)4_Install Drainage(f)5_Place OGDC Mainline(a)5_Place OGDC Mainline(b)5_Place OGDC Mainline(c)5_Place OGDC Mainline(d)6_Pave E.B. Mainline(a)6_Pave E.B. Mainline(b)6_Pave E.B. Mainline(c)7_Place OGDC Ramps and Ga…7_Place OGDC Ramps and Ga…8_Pave E.B. Gaps and Ramp…8_Pave E.B. Gaps and Ramp…8_Pave E.B. Gaps and Ramp…9_Place Gravel Shoulder(a)9_Place Gravel Shoulder(b)9_Place Gravel Shoulder(c)10_Slope Grading and Rest…10_Slope Grading and Rest…11_Stripe to Open Pavemen…12_Relocate Barrier Wall13_Re-stripe W.B.14_All Lanes Open
planned in progress complete critical path
Cumulative cost
$590k$1.2M$1.8M$2.4Mday 101plannedprojected
Today's decisions
1_Strip Topsoil(a)0%
Crews: 100% pace · $12,565/day — hire or fire
i69_act1_crew1 $12,565/day
Backhoe Loader $323/d1/1
Dump Truck $586/d4/4
Equipment Operator $512/d2/2
Hyd Excavator $952/d1/1
Worker $392/d11/11
Foreman $417/d5/5
Truck Driver $381/d4/4
Staffing resets to the full complement each morning. Fewer hands slow the pace; extra hands cost full wages at 80% effectiveness.
Events
Nothing has gone wrong. Yet.