iCDMA · interactive construction decision-making
Run the job. Own the consequences.
Pick a project. Each day you decide crews, hours, and material orders; the simulation decides what the weather, the deliveries, and your earlier choices do to the schedule and the budget. Query the future when you want to see the risk you are carrying.
Truss Bridge
5 activities, 14 planned days. Tight site storage forces delivery decisions. The place to learn the loop.
5 activities · start 2011-07-11
I-69 Reconstruction
14 activities from a real Michigan DOT highway job — the project the research was validated against.
14 activities · start 2009-06-09
Highway (time-based)
24 activities, ~140 planned days, stochastic material failures and high water tables.
43 activities · start 2009-06-09
Highway (production-based)
The same highway staged by production sections instead of time windows.
43 activities · start 2009-06-09
Road (CPM staging)
24 activities with shared crews and scarce site space — parallel work competing for the same deliveries.
24 activities · start 2009-06-09
Steel Erection
18 activities of structural steel: cranes, oilers, welders — miss a key trade and nothing moves.
18 activities · start 2008-06-16
Steel Project
A second steel-erection staging of the same scope.
18 activities · start 2008-06-16
House Construction
A compact residential build.
6 activities · start 2011-08-02
Engine ported from the Virtual Coach / iCDMA research system (2003–2013) and verified against it to the cent. Scenarios recovered from the original research database. About this project — the people, the papers, the funding.