iCDMA · I-69 Reconstruction

Day 1 · Tue 2009-06-09

Sunny
Planned: $237,648,237 by day 47
Spent: $0 · site space 0/1800
Schedule
181522293643today 1_Strip Topsoil 0%2_Remove Concrete Pavemen…4_Install Drainage 3_Grade Subbase 5_Place OGDC Mainline …6_Pave E.B Mainline7_Place OGDC Ramps and Ga…8_Pave E.B Ramps and Gaps9_Place Gravel Shoulder10_Slope Grading and Rest…11_Stripe to Open Pavemen…12_Relocate Barrier Wall 13_Re-stripe W.B. 14_All Lanes Open
planned in progress complete critical path
Cumulative cost
$62.4M$124.8M$187.1M$249.5Mday 47plannedprojected
Today's decisions
1_Strip Topsoil 0%
Crews: 100% pace · $19,029/day — hire or fire
i69_act1_crew1 $12,565/day
Backhoe Loader $323/d1/1
Dump Truck $586/d4/4
Equipment Operator $512/d2/2
Hyd Excavator $952/d1/1
Worker $392/d11/11
Foreman $417/d5/5
Truck Driver $381/d4/4
i69_act1_crew2 $6,464/day
Worker $392/d12/12
Foreman $417/d3/3
Pickup $128/d1/1
Truck Driver $381/d1/1
Staffing resets to the full complement each morning. Fewer hands slow the pace; extra hands cost full wages at 80% effectiveness.
Events
Nothing has gone wrong. Yet.